Flexidry a floor screed additive that dramatically reduces drying times.
Flexidry floor screed.
All these screeds make it possible to let light foot traffic proceed within 12 hours of installation.
Screeding a floor is the simple act of applying a well blended mixture of ordinary portland cement with graded agregates and water to a floor base in order to form a sturdy sub floor that is capable of taking on the final floor finish or act as a final wearing surface.
The recognised testing method for flexidry floor screeds is a.
Please check out the similar products section for alternatives.
An advanced and highly adaptive fast drying screed additive flexidry is an advanced and highly adaptive screed system which can be used on a wide range of floor applications.
Why wait 110 days for your floor screed to dry when you can choose 3 7 14 or 21 days.
For the promised features and the effect of the flexidry f0 formula.
The various flexidry fast drying floor screeds include flexidry f0 with a drying time of just 3 days flexidry f1 which dries in 7 days flexidry f2 which takes 14 days and flexidry f3 which takes 21 days to dry.
Having already been used successfully in thousands of projects across europe flexidry is a cost effective accelerated screed system which can be used on a wide range of floor applications giving a choice of dry times of 7 14 or 21 days.
Testing of the screed moisture testing.
U sed successfully in thousands of projects throughout europe flexidry is a low concentrated liquid additive that is simply added to a cementitious screed mix on site.
Floor screeding the essential guide to floor screeding last updated 03 feb 2013 csc screeding.
The recognised testing method for flexidry floor screeds is a carbide bomb test which should always be carried out before laying sensitive floor coverings.
By altering the dosage the dry time of the screed can be chosen at 7 14 or 21.
In 2008 flexidry global limited launched a floor screed additive into the uk market which dramatically reduces drying times.
This would normally mean that a 75mm standard screed application would take 110 days at 20c to receive a sensitive final floor finishings and this is something that is quite often overlooked.
Products with have technical specifications.